- Quarterly V 2 O 5 equal manufacturing of two,768 tonnes (6.1 million lbs 1 ) in This fall 2023, a 38% enhance over the two,005 tonnes produced in This fall 2022
- Annual V 2 O 5 manufacturing of 9,681 tonnes (21.3 million lbs 1 ) in 2023 vs. 10,436 tonnes in 2022; Inside the Firm’s 2023 annual manufacturing steerage vary of 9,000 – 11,000 tonnes
- Quarterly international V 2 O 5 restoration of 79.4% in This fall 2023, a 6% enhance over the 74.7% achieved in This fall 2022; Annual international V 2 O 5 restoration of 80.0% in 2023 vs. 79.1% in 2022
- Quarterly gross sales of two,605 tonnes of V 2 O 5 equal (inclusive of 139 tonnes of bought materials) in This fall 2023 vs. 2,774 tonnes in This fall 2022
- Annual V 2 O 5 equal gross sales of 10,396 (inclusive of 929 tonnes of bought materials) tonnes in 2023 vs. 11,091 tonnes in 2022; Inside the Firm’s annual 2023 gross sales steerage of 8,700 – 10,700 tonnes
- Ramp up of the Firm’s ilmenite focus manufacturing stays ongoing with 8,970 tonnes produced in This fall 2023; Ilmenite manufacturing was 814 tonnes in October, 2,546 tonnes in November and 5,610 tonnes in December
- In October, Largo Clear Vitality’s (“LCE”) 6 megawatt-hour vanadium redox movement battery (“VRFB”) deployment for Enel Inexperienced Energy España (“EGPE”) was validated to function on check situations based on EGPE specs and LCE check procedures
- The Firm’s evaluation of strategic alternate options for LCE to judge alternatives to maximise worth within the clear vitality transition stays ongoing
- The Firm revealed its second annual Local weather Report , aligned to the Taskforce on Local weather-related Monetary Disclosures which highlighted enhancements to sure climate-related metrics and targets
Vanadium Market Replace 2
- The common benchmark value per lb of V 2 O 5 in Europe was $6.46 in This fall 2023, a 22% lower from the common of $8.25 seen in This fall 2022; The common benchmark value at December 31, 2023 was $6.53, a 31% lower from the common of $9.44 at December 31, 2022
- The common benchmark value per kg of ferrovanadium in Europe was $26.61 in This fall 2023, a 20% lower from the common of $33.20 seen in This fall 2022; The common benchmark value at December 31, 2023 was $28.70, a 21% lower from the common of $36.50 at December 31, 2022
- Vanadium spot demand was gentle in This fall 2023, primarily as a consequence of adversarial situations within the Chinese language and European metal industries, nevertheless, robust demand from the aerospace sector continued; Demand within the vitality storage market is anticipated to extend in future quarters, particularly in China
- The decline in vanadium costs through the quarter is predicted to negatively influence the Firm’s This fall 2023 monetary outcomes
Largo Inc. (” Largo ” or the ” Firm “) ( TSX: LGO ) ( NASDAQ: LGO ) right now broadcasts annual manufacturing of 9,681 tonnes (21.3 million lbs 1 ) of vanadium pentoxide (” V 2 O 5 “) equal from its Maracás Menchen Mine and gross sales of 10,396 tonnes of V 2 O 5 equal in 2023.
This press launch options multimedia. View the total launch right here: https://www.businesswire.com/information/house/20240122645527/en/

Largo Reviews Fourth Quarter and Full 12 months 2023 Operational and Gross sales Outcomes Highlighted by Report Quarterly Excessive Purity V2O5 Manufacturing; Gives 2024 Steerage (Photograph: Enterprise Wire)
Daniel Tellechea, Interim CEO of Largo, acknowledged: “The Firm continues to enhance the operational effectivity of its Maracás Menchen Mine, and noticed a substantial enchancment in manufacturing leads to the fourth quarter of 2023. In consequence, the Firm managed to attain its annual manufacturing and gross sales steerage for 2023. The Firm continues to put as many items as attainable within the premium yielding excessive purity vanadium sector, attaining a document manufacturing of 1,670 tonnes of excessive purity V 2 O 5 equal in This fall 2023, representing 60% of the Firm’s quarterly V 2 O 5 output. This enchancment is predicted to partially offset the influence of decrease vanadium costs in This fall 2023, which fell to their lowest degree in roughly two years, and decrease gross sales volumes in comparison with This fall 2022.
He continued: “In This fall 2023, we continued to ramp up our ilmenite focus plant and are happy to offer the primary annual steerage for this materials in 2024. With a considerable funding on this new plant in 2022/2023, we sit up for reaping the advantages of diversifying Largo’s product providing and revenues in 2024 from anticipated ilmenite gross sales as by-product of our conventional vanadium operations. We accomplished our first 500 tonne ilmenite sale in January 2024 and count on to promote between 8,500 – 10,500 tonnes in Q1 2024. For the approaching 12 months, it’s our precedence to stay targeted on optimizing our operations, decreasing prices, and attaining our manufacturing and gross sales targets as we proceed to navigate a decrease vanadium value atmosphere. Lastly, Largo stays devoted to advancing its exploration program surrounding the Maracás Menchen Mine as we attempt to plan for future development.”
Maracás Menchen Mine Operational and Gross sales Outcomes
This fall 2023 |
This fall 2022 |
2023 |
2022 |
|||||
Whole Mined – Dry Foundation (tonnes) |
3,490,711 |
2,737,149 |
14,864,394 |
10,517,210 |
||||
Whole Ore Mined (tonnes) |
473,958 |
326,552 |
1,752,982 |
1,359,927 |
||||
Ore Grade Mined – Efficient Grade (%) 3 |
0.82 |
0.96 |
0.81 |
1.11 |
||||
Focus Produced (tonnes) |
112,512 |
90,797 |
377,736 |
406,951 |
||||
Grade of Focus (%) |
3.01 |
2.94 |
3.08 |
3.18 |
||||
International Restoration (%) 4 |
79.4 |
74.7 |
80.0 |
79.1 |
||||
V 2 O 5 produced (Flake + Powder) (tonnes) |
2,768 |
2,004 |
9,681 |
10,436 |
||||
Excessive purity V 2 O 5 equal produced (%) |
60% |
43% |
47% |
27% |
||||
V 2 O 5 produced (equal kilos) 1 |
6,102,388 |
4,418,058 |
21,342,926 |
23,007,414 |
||||
Whole V 2 O 5 equal offered (tonnes) |
2,605 |
2,774 |
10,396 |
11,091 |
||||
Produced V 2 O 5 equal offered (tonnes) |
2,466 |
2,656 |
9,467 |
10,034 |
||||
Bought V 2 O 5 equal offered (tonnes) |
139 |
118 |
929 |
1,057 |
This fall, FY 2023 and Different Updates
- Whole ore mined was 473,958 tonnes in This fall 2023, a forty five% enhance over the 326,552 tonnes mined in This fall 2022. The Firm closed 2023 with 1,752,982 tonnes of ore mined, representing a 29% enhance as in comparison with the earlier 12 months.
- Crushing availability improved in This fall 2023 with complete ore crushed of 465,619 tonnes, representing an 8% enhance over the 430,256 tonnes crushed in Q3 2023 and a 35% enhance over the 343,773 tonnes crushed in This fall 2022. The Firm closed 2023 with 1,685,166 tonnes of ore crushed, being 9% larger than 2022.
- The worldwide restoration 3 achieved in This fall 2023 was 79.4%, being 6% larger than 74.7% achieved in This fall 2022 and three% larger than the 76.9% achieved in Q3 2023. The worldwide restoration 3 in October was 79.2%, 78.9% in November and 80.0% in December. The worldwide restoration achieved in 2023 was 80.0%, being 1% larger than the 79.1% achieved in 2022.
- In December, the Firm secured an extra debt facility of $10.0 million with a financial institution in Brazil. The power is for 2 years with a price of 0.85% and an accrued rate of interest of 10.45% p.a. to be paid on maturity. This debt facility is getting used to fund working capital necessities.
- In December 2023, the Firm offered an replace on the continued exploration program surrounding its Maracás Menchen Mine, together with an preliminary section of drilling performed in 2023 and the additional evaluation of previous exploration work accomplished on the Firm’s Campbell Pit and exploration targets situated each north and south of the Campbell Pit. The Firm’s objective for this program is to determine a possible mineralized pattern measuring greater than 7 kilometres (“km”) alongside strike by establishing a correlation between the recognized mineralization intercepted between Novo Amparo North (“NAN”) to the Campbell Pit ( see press launched dated December 18, 2023 ).
- In 2022 and 2023, the Firm performed a drill program north and south of the Campbell Put consisting of 19 drill holes and 245 floor samples, 148 infill holes within the Campbell Pit and 33 holes within the Southern District (the ” 2023 Marketing campaign “)The Firm is within the means of analyzing its historic drill information and the remaining holes from the 2023 Marketing campaign with outcomes anticipated in Q1 2024.
- In 2024, the Firm anticipates finishing roughly 15,300 metres of exploration drilling with efforts primarily specializing in areas north and south of the Campbell Pit with recognized magnetic and geochemical anomalies. Exploration efforts may even deal with concessions surrounding the Maracás Menchen Mine that require drilling in an effort to keep good standing in accordance with the relevant guidelines and laws in Brazil. The Firm’s 2024 drilling marketing campaign is predicted to start in February 2024.
2024 Steerage
Tables summarizing the Firm’s 2024 manufacturing, gross sales and price steerage is offered beneath. The Firm expects decrease V 2 O 5 equal manufacturing in Q1 2024 as a consequence of a deliberate kiln refractory substitute in February 2024.
V 2 O 5 Equal Manufacturing, Gross sales and Money Working Prices Excluding Royalties
Q1 |
Q2 |
Q3 |
This fall |
2024 |
|||||||||||
Low |
Excessive |
Low |
Excessive |
Low |
Excessive |
Low |
Excessive |
Low |
Excessive |
||||||
Manufacturing (tonnes) |
1,700 |
2,200 |
2,400 |
2,900 |
2,550 |
3,050 |
2,350 |
2,850 |
9,000 |
11,000 |
|||||
Gross sales (tonnes) i |
2,300 |
2,800 |
2,100 |
2,600 |
2,100 |
2,600 |
2,200 |
2,700 |
8,700 |
10,700 |
|||||
Money working prices excluding royalties ($ / lb V 2 O 5 offered) ii |
4.50 |
5.50 |
4.15 |
5.15 |
4.75 |
5.75 |
4.75 |
5.75 |
4.50 |
5.50 |
i. |
The annual 2024 gross sales steerage doesn’t embody bought materials. |
|
ii. |
Money working prices per pound and money working prices excluding royalties per pound are non-GAAP ratios with no commonplace that means beneath IFRS, and might not be similar to comparable monetary measures disclosed by different issuers. Confer with the “Non-GAAP Measures” part of this press launch. |
Ilmenite Focus Manufacturing and Gross sales
Q1 |
Q2 |
Q3 |
This fall |
2024 |
|||||||||||
Low |
Excessive |
Low |
Excessive |
Low |
Excessive |
Low |
Excessive |
Low |
Excessive |
||||||
Manufacturing (tonnes) |
10,000 |
12,000 |
18,000 |
21,000 |
21,000 |
24,000 |
24,000 |
28,000 |
73,000 |
85,000 |
|||||
Gross sales (tonnes) |
8,500 |
10,500 |
9,500 |
11,500 |
19,500 |
21,000 |
22,500 |
24,000 |
60,000 |
67,000 |
Vanadium Distribution Prices |
$6.0 – 8.0 million |
|
Ilmenite Focus Distribution Prices |
$2.0 – 4.0 million |
|
Company and Gross sales & Buying and selling, Basic and Administrative Bills |
$7.5 – 8.5 million |
|
LCE Operational Prices |
$7.0 – 9.0 million |
2024 Capital Expenditures Steerage
The Firm plans to take a position roughly $33.0 million on capital expenditures in 2024, together with roughly $14.0 million for sustaining capital necessities, $15.6 million for capitalized stripping and $3.5 million for sure manufacturing course of objects associated to the ilmenite focus plant.
Sustaining Capital Expenditures |
$12.8 – 14.8 million |
|
Capitalized Stripping Capital Expenditures |
$14.6 – 16.6 million |
|
Ilmenite Focus Plant Capital Expenditures |
$3.2 – 3.8 million |
About Largo
Largo is a globally acknowledged vanadium firm recognized for its high-quality VPURE™ and VPURE+™ merchandise, sourced from its Maracás Menchen Mine in Brazil. The Firm is presently targeted on the ramp up of its ilmenite focus plant and is enterprise a strategic analysis of its U.S.-based clear vitality enterprise, together with its superior VCHARGE vanadium battery know-how to maximise the worth of the group. Largo’s strategic marketing strategy facilities on sustaining its place as a number one vanadium provider with a development technique to assist a low-carbon future.
Largo’s widespread shares commerce on the Nasdaq Inventory Market and on the Toronto Inventory Alternate beneath the image “LGO”. For extra data on the Firm, please go to www.largoinc.com .
Cautionary Assertion Concerning Ahead-looking Data:
This press launch comprises “forward-looking data” and “forward-looking statements” throughout the that means of relevant Canadian and United States securities laws. Ahead-looking data on this press launch contains, however will not be restricted to, statements with respect to the timing and quantity of estimated future manufacturing and gross sales; the long run value of commodities; prices of future actions and operations, together with, with out limitation, the impact of inflation and alternate charges; the impact of unexpected tools upkeep or repairs on manufacturing; timing and ramp-up of the ilmenite plant; the power to provide vanadium trioxide based on buyer specs; the extent of capital and working expenditures; the influence of world delays and associated value will increase on the Firm’s international provide chain and future gross sales of vanadium merchandise. Ahead-looking data on this press launch additionally contains, however will not be restricted to, statements with respect to our capability to construct, finance and efficiently function a VRFB enterprise, the ramp-up of the Firm’s ilmenite focus manufacturing; the evaluation of strategic alternate options for LCE; diversifying the Firm’s product providing; optimizing our operations, decreasing prices, and attaining our manufacturing and gross sales targets; the anticipated timing of the 2023 Marketing campaign outcomes; establishing a correlation between the recognized mineralization intercepted from NAN to the Campbell Pit; the 2024 drilling marketing campaign at Campbell Pit; the kiln refractory substitute and deliberate capital expenditures in 2024.
The next are among the assumptions upon which forward-looking data relies: that basic enterprise and financial situations is not going to change in a fabric adversarial method; demand for, and steady or enhancing value of V2O5 and different vanadium commodities; receipt of regulatory and governmental approvals, permits and renewals in a well timed method; that the Firm is not going to expertise any materials accident, labour dispute or failure of plant or tools or different materials disruption within the Firm’s operations on the Maracás Menchen Mine or referring to LCE; the supply of financing for operations and growth; the power to mitigate the influence of constant heavy rainfall; the Firm’s capability to obtain tools and working provides in adequate portions and on a well timed foundation; that the estimates of the sources and reserves on the Maracás Menchen Mine are inside cheap bounds of accuracy (together with with respect to measurement, grade and restoration and the operational and value assumptions on which such estimates are based mostly); the competitiveness of the Firm’s VRFB know-how; that the Firm’s present plans for ilmenite and VRFBs will be achieved; the Firm’s “two-pillar” enterprise technique might be profitable; the Firm’s gross sales and buying and selling preparations is not going to be affected by the evolving sanctions in opposition to Russia; and the Firm’s capability to draw and retain expert personnel and administrators; the power of administration to execute strategic objectives.
Ahead-looking statements will be recognized by means of forward-looking terminology comparable to “plans”, “expects” or “doesn’t count on”, “is predicted”, “price range”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “doesn’t anticipate”, or “believes”, or variations of such phrases and phrases or statements that sure actions, occasions or outcomes “might”, “may”, “would”, “may” or “might be taken”, “happen” or “be achieved”. All data contained on this information launch, apart from statements of present and historic truth, is ahead trying data. Ahead-looking statements are topic to recognized and unknown dangers, uncertainties and different elements which will trigger the precise outcomes, degree of exercise, efficiency or achievements of Largo or LCE to be materially completely different from these expressed or implied by such forward-looking statements, together with however not restricted to these dangers described within the annual data type of Largo and in its public paperwork filed on www.sedar.com and accessible on www.sec.gov occasionally. Ahead-looking statements are based mostly on the opinions and estimates of administration as of the date such statements are made. Though administration of Largo has tried to determine necessary elements that would trigger precise outcomes to vary materially from these contained in forward-looking statements, there could also be different elements that trigger outcomes to not be as anticipated, estimated or meant. There will be no assurance that such statements will show to be correct, as precise outcomes and future occasions may differ materially from these anticipated in such statements. Accordingly, readers mustn’t place undue reliance on forward-looking statements. Largo doesn’t undertake to replace any forward-looking statements, besides in accordance with relevant securities legal guidelines. Readers also needs to evaluation the dangers and uncertainties sections of Largo’s most up-to-date annual and interim MD&A, which additionally apply.
Emblems are owned by Largo Inc.
Future Oriented Monetary Data:
Any monetary outlook or future oriented monetary data contained on this press launch, as such time period is outlined by relevant securities legal guidelines, has been accepted by administration of Largo as of the date hereof and is offered for the aim of offering details about administration’s present expectations and plans referring to the Firm’s 2024 steerage. Readers are cautioned that any such future oriented monetary data contained herein shouldn’t be used for functions apart from these for which it’s disclosed herein. The Firm and its administration imagine that the potential monetary data as to the Firm’s anticipated 2024 steerage has been ready on an inexpensive foundation, reflecting administration’s finest estimates and judgments. Nonetheless, as a result of this data is extremely subjective, it shouldn’t be relied on as essentially indicative of future outcomes.
Non-GAAP 5 Measures
The Firm makes use of sure non-GAAP monetary efficiency measures on this press launch, that are described within the following part.
Money Working Prices
The Firm’s press launch refers to money working prices per pound, a non-GAAP efficiency measure, in an effort to present traders with details about a key measure utilized by administration to watch efficiency. This data is used to evaluate how nicely the Maracás Menchen Mine is performing in comparison with plan and prior intervals, and in addition to evaluate its total effectiveness and effectivity. Money working prices contains mine web site working prices comparable to mining prices, plant and upkeep prices, sustainability prices, mine and plant administration prices, royalties and gross sales, basic and administrative prices (all for the Mine properties section), however excludes depreciation and amortization, share-based funds, overseas alternate positive factors or losses, commissions, reclamation, capital expenditures and exploration and analysis prices. Working prices not attributable to the Mine properties section are additionally excluded, together with conversion prices, product acquisition prices, distribution prices and stock write-downs. These prices are then divided by the kilos of vanadium offered that had been produced by the Maracás Menchen Mine to reach on the money working prices per pound. This measure differs to the brand new complete money prices non-GAAP measure the Firm makes use of to measure its total efficiency (see Firm’s newest Administration Dialogue and Evaluation). These measures, together with revenues, are thought-about to be one of many key indicators of the Firm’s capability to generate working earnings and money movement from its Maracás Menchen Mine. These money working prices measures do not need any standardized that means prescribed by IFRS and differ from measures decided in accordance with IFRS. These measures are meant to offer extra data and shouldn’t be thought-about in isolation or as an alternative choice to measures of efficiency ready in accordance with IFRS. These measures aren’t essentially indicative of web earnings or money movement from working actions as decided beneath IFRS.
____________________________
1 Conversion of tonnes to kilos, 1 tonne = 2,204.62 kilos or lbs.
2 Fastmarkets Steel Bulletin.
3 Efficient grade represents the proportion of magnetic materials mined multiplied by the proportion of V2O5 within the magnetic focus.
4 International restoration is the product of crushing restoration, milling restoration, kiln restoration, leaching restoration and chemical plant restoration.
5 GAAP – Typically Accepted Accounting Rules
View supply model on businesswire.com: https://www.businesswire.com/information/house/20240122645527/en/
Investor Relations
Alex Guthrie
Senior Supervisor, Exterior Relations
+1.416.861.9778
aguthrie@largoinc.com